top of page

Tower House 10th Floor (Bristol)

Office space refurbishment allowing for an increase in the lettable rate per sq ft

Design elements included -

  • New noise reducing timber effect flooring

  • Concrete effect wall cladding

  • Suspended LED lighting

  • New teapoint

  • Silver backed blinds to reduce glare and solar gain

bottom of page